Friday, November 10, 2023

Fuselage center section #86 - avionics deck!

Started working on the avionics deck.

Match drilled the avionics deck to the longerons.  Be careful to drill the holes and match drill with the flange that is on the vertical rib that is under the longeron.  I used a thin stainless piece to stop the drill bit after it went thru the longeron.

Other side done.
Cleco'ed the rib to the avionics deck.  Then match drilled the angle.



Then started riveting the avionics deck to the longeron.

Then riveted the rib to the deck.

And riveted the headset hangers to the underside.


No comments:

Post a Comment